From Commissioning to Adoption: What Happens Next for an Adoptable Pumping Station?
Reaching commissioning is an important point in any pumping station project. By this stage, the equipment has been installed, the main mechanical and electrical works are complete and the station is approaching the point where it can begin performing the role it was designed for. For an adoptable pumping station, however, commissioning does not necessarily…
Read MoreManaging Change on a Pumping Station Project: What Happens When the Design Moves?
Few construction projects finish exactly as they were first drawn. Drainage layouts evolve. Levels change. Rising main routes move. Development phasing can alter. The proposed adopting organisation may even change altogether. None of this is particularly unusual. The challenge is making sure changes made in one part of the development do not create unexpected consequences…
Read MoreWhat Should Be Checked Before an Adoptable Pumping Station Is Commissioned?
By the time a pumping station reaches commissioning, most of the work that determines whether the process will run smoothly has already happened. The civil structures have been built. The pumps and associated equipment have been installed. The rising main is in place and the electrical and control systems have progressed towards completion. Commissioning is…